Project: Kype Muir Windfarm

  • Project: Kype Muir Windfarm
  • Owner: Banks Renewables
  • Client: RJ McLeod
  • Engineer: Natural Power
  • Location: South Lanarkshire, Scotland

Electrical Balance of Plant contract for a 33kV connected windfarm consisting of 26 X 3.4MW Senvion Machines.

Project Scope

Design and Build contract for the engineering, procurement, construction and commissioning of electrical works to all Banks Renewables and SPEN functional specifications including;

  • 8 Panel 33kV Siemens NxPlus Switchboard
  • Substation earthing and lightning protection
  • HV system control, protection, metering, remote annunciation panels and battery systems
  • Implementation of a full substation SCADA PLC system for client remote monitoring and control
  • 33kV collector circuit cabling including Metmast
  • Fibre Optic communications network for WTG’s and Metmast
  • Full Substation Commissioning works including 33kV switchboard and protection relays
  • Commissioning of 33kV collector circuit including VLF testing Fibre Optic OTDR
  • Energisation of substation and collector circuit in line with Senvion and SPEN